Construction
The construction process, captured in these photos, highlights the transformation from the outdated interior to a refined, modern space. The first step involved removing all the pre-existing wall panels and moldings, followed by the arrival and installation of new ceramic tiles. The redesign of the ceiling and light fixtures brought a fresh, contemporary feel to the space, complemented by a cohesive new paint scheme throughout the apartment. Veneer samples were carefully selected for the wall panels, ensuring the perfect balance of texture and tone, before their installation began. Throughout the process, I worked closely with carpenters and contractors, focusing on the fine details of the joints to achieve a seamless result.